March 23, 2019

Value Engineering - Recent Developments



Value Engineering - Research - Dissertations and Papers



Implementation of Value Engineering for Construction Efficiency
Mukti Weni Harini, Erizal and Meiske Widyarti
Asian Journal of Applied Sciences (ISSN: 2321 – 0893)
Volume 06 – Issue 02, April 2018



Article first posted on 25 April 2015

Take a system-wide view as part of Value Engineering and identify s the weak link in
a chain of components. If the weak link is performing at the desired level, other
components in the product might be over engineered. Examine the design of the other components for reducing the cost.

On the other hand, improving the characteristics of the weak link could increase the overall performance of the system and may give a higher performance system at a lower cost.
http://argoconsulting.com/content/wp-content/uploads/2015/03/Argo_ValueEngineering_FINAL-March-20151.pdf

Integrated Construction Value Engineering
http://managementsolutionsllc.com/articles/integrated-value-engineering-delivering-value-across-the-project-lifecycle/


Value Engineering Risk Analysis
http://www.wsdot.wa.gov/publications/fulltext/CEVP/VERA.pdf


Value Engineering of Divan
http://www.ijirset.com/upload/2014/october/24_Application.pdf




Industrial Engineering Knowledge Revision Plan - One Year Plan


January - February - March - April - May - June



July - August - September - October - November - December

Updated on 24 March 2019,  25 April 2015

No comments:

Post a Comment